Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition)

Free download. Book file PDF easily for everyone and every device. You can download and read online Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition) file PDF Book only if you are registered here. And also you can download or read online all Book PDF file that related with Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition) book. Happy reading Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition) Bookeveryone. Download file Free Book PDF Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition) at Complete PDF Library. This Book have some digital formats such us :paperbook, ebook, kindle, epub, fb2 and another formats. Here is The CompletePDF Book Library. It's free to register here to get Book file PDF Verbessert Pay for Performance für Hochschullehrer die Leistungen an Hochschulen? (German Edition) Pocket Guide.

Arrangements that enable a safe and rational execution of work must be made for repair and maintenance as well as for cleaning.

Watch the video as well!

The access openings for assembly control and cleaning as well as measurement must be provided in sufficient numbers and be accessible without risk. One must be able to dismantle and assemble parts which need to be exchanged under normal operating conditions, without structural alterations. The special tools required for this must be supplied along with this by the Agent. For the ease and guarantee safe transport, assembly and dismantling work, devices and all parts that can be lifted, must be provided with eyelets or such, which should be affixed as per the assembly conditions of the devices.

All assembly eyelets, support lugs and brackets must be designed to bear the total weight of the device. The weights of removable device parts must be visibly hammered in.

Monographs

Further, the Agent must prepare lists of auxiliary media and lubricants based on the specifications of the Principal part B During the preparation of the overhaul concept, specifications corresponding to the processing guidebook Annex 11 must be taken into consideration. The report time span includes the period from the 26th of a month to the 25th of the following month.

The progress report must be available to the Principal by due date, latest up to the third working day of the following month. If the report is not handed over punctually, the Principal sets an extension time for the Agent. If the report is not available even after the extension, all deadline deviations within the time span of the report will be considered to be the fault of the Agent. Changes in costs must be quantified in relation to the positions stated in Clause 4. The Agent will keep the minutes simultaneously during the meeting, reconcile the contents with the Principal at the end of the meeting, adopt them, and distribute the report, initialled by all parties present and distribute it to all representing parties.

With regard to finalisation of technical details, the minutes of the meeting are binding on the Agent. Extensions leading to cost overruns of the scope of supply and services are not to be understood as "finalisation of technical details". The Agent shall inform the Principal about his the Agent's meetings with his suppliers or other third parties in connection with this project, by forwarding a report, even if the Principal has not made use of his right to participation as per Clause 1.

Holding of status talks by multimedia is not envisioned. Apart from clarification of latest technical problems, the status talks serve to continuously follow the progress of the project with regard to the time bound fulfilment of all intermediate objectives. Here, the Agent must particularly take into consideration that the FGD must be optimally integrated into the duo-steam-generator-powerhouse and is therefore in close agreement and cooperation with the Overall Planner and Principal's contractor authorised for further sub-systems, work out concepts for the interaction under consideration of a technically optimal, safe and economical solution.

The Agent must work up the given conditions regarding location and specifications as per Annex 6 within the framework of concept planning and ensure a balance with the requirements. Thereby, in correlation with the installation and commissioning of the new components and systems as well as the connection to available equipment of the existing power plant blocks, it is to be taken into consideration to the extent necessary that, during the construction period, existing blocks will still be in operation, the operation of and access to which must not be affected by the new construction measures.

The concept planning includes, amongst others, the layout, planning and calculations within the supply limits given under Clause 2. As part of the preliminary work for the approval applications and the required expert opinion, the Agent prepares all the documents for the approval of the FGD and does the preliminary work for acquiring the approval for the entire powerhouse.

This also applies to plans for fire, escape and rescue routes, zone plans for hazard and explosion protection, fire prevention, escape route and explosion prevention concepts. Particularly Annexes 59 ff are to be considered as a basis for this preliminary work. This applies in particular to the building permission and the steam boiler license. Documents that are submitted along with the application for approval must be handed over in digital editable EDP-format and hard copy in original with up to 60 copies. The Agent must make available documents that are required to be signed in original in the required numbers.

Evaluation of possible release of substances and reactions during malfunction of process operation and within the framework of Hazardous Incident Ordinance 12 BimSchV o Information on substances e. Preparation of layout plans in the officially prescribed scale , for the FGD and its secondary sections.

Deutsches Komitee für Nachhaltigkeitsforschung in Future Earth | Aktuelles > News

Information on necessary platforms and mezzanines are also part of layout plans. The documents required for the application and approval as per BImSchG will be synchronised and uniformly put together by the Overall Planner. The Agent will follow the formal specifications of the Principal or the Overall Planner for the compilation of the records and documents.

All approval documents that are demanded by the Principal filled-in forms, overview drawings, plant descriptions etc, if necessary, in greater numbers are to be affixed with stamp and original signatures. The exact extent of the documents to be provided will be determined in coordination with the responsible authorities by the Principal before submitting the application for approval. The Agent must, on demand by the Principal, participate in discussions with authorities or other parties involved in the planning of the eligibility in case this is necessary e.

The essential documents of the application for approval can be taken from Annex Documents over and above that must be coordinated by the Principal and the Agent within the framework of the approval procedure. The documents markings under Annex 74 could differ in the exact wording from those in the BImSchG-application. The services include in particular the design details, layout and implementation planning and construction as continuation of the conceptualisation.

Thereby one must keep the concept of architecture in mind and maintain a continuous facade. Specifications for implementation of documentation are to be taken in particular from Annex 10, the process guidebook as per Annex 11 , Clause 2. NORME 4 2. Cas particuliers 7 8. Ce glossaire est progressivement enrichi.


  • Table of contents;
  • Max-Planck-Institut für ausländisches und internationales Privatrecht - Aktuelle Forschung.
  • Uploaded by.
  • News Deutschland?
  • Maria Bertele.
  • Train Dreams: A Novella.

La chambre repose sur quatre pieds hauts de 10 mm. Disposer le tout au centre de la chambre de combustion 5. Sans objet. Ce genre d'essai correspondant aux types de combustion A ou B. Ce genre d'essai correspondant au type de combustion C. Ce genre d'essai correspondant aux types de combustion D ou E. Interior Materials to be tested 2.

Test conditions 3. Temperature and Relative humidity during test specimen preconditioning. Test results 4. GRILL 5.

https://newslebdiso.ga

Datenschutzerklärung

General case 7 8. Specific case 7 8. The test can be done on surface materials, on a composite consisting of this surface material attached to underlying material, as well as on the underlying materials. This glossary is progressively augmented. Observe the type of combustion and determine the speed of combustion between two reference marks.

The front face of this chamber has an incombustible observation window which can cover the whole front face and which can serve as an access panel. The rear side of the chamber has 10 apertures of 19 mm diameter for ventilation, the upper part includes an opening of The chamber rests on four feet 10 mm in height. On one of the sides, the chamber may have an orifice for introduction of sample holders; on the other side, an opening allows the gas supply hose to pass through. The melted material is recovered in a basin, placed at the bottom of the chamber between the ventilation apertures without covering them.

The pins also serve as reference marks at the beginning and end of combustion. The lower part of the sample must be mm above the bottom plate. The distance between the front edge of the sample holder and the end of the chamber must be 22 mm. This grill consists of a sample holder 5. This mirror is placed in such a way that no burning or melting material can reach it. It allows a good view of the sample whatever be the material tested, in the presence of fumes or dust for example.

This is placed in the chamber in such a way that the centre of the nozzle is 19 mm below the centre of the lower edge of the sample. Before the test, the vertical air velocity in the laboratory hood is measured mm in front of and behind the place intended position of the combustion chamber. It should be between 0. The hood thus regulated, functions during the test. It is possible to use the hood for natural ventilation with appropriate air velocity.

If these conditions are not complied with, the hood must not operate. The samples must be representative of the magnitude and importance of the characteristic. To ensure this representativity, it is necessary to know the fundamental characteristics of the population surveyed. The criteria of selection of samples must be specified in the Test Report RE , the content of which is defined in the standard A10 All materials which do not adhere to another material at each point of contact is tested on their own.

All materials which adhere to one or other material s at all points of contact, is are tested along with the other material s , as a composite. For the samples that are to undergo ageing 8. When the width is less that mm, use the width available, on a length of mm. When the length available is less than mm and when the width available is less than mm, carry out the test on a representative sample in terms of material, process, colour, etc.

Print&Transformation for the Digital Age

In this case, with the possible distance of combustion corresponding to the length of the sample, the measurement begins at the first reference mark. Material B is at a distance of less than 13 mm from the surface of the cabin. Materials A and B are tested together, within a limit of thickness of 13 mm. Material B has a non-adherent surface of contact at all points to material C.

Materials B and C are tested separately, like two simple materials. Material C is not tested since the distance from the surface of the cabin is more than 13 mm. Material B has an adherent surface of contact at all points to material C. Material A is tested alone Materials B and C are tested together, within a limit of thickness of 13 mm. NOTE : Regardless of the problem encountered, when two materials make up less than 13 mm of the chamber and have adherent contact surface, but not at all points, the two materials must be tested together and must also be tested separately as two separate materials.

admin